Our process

How we design and build,step by step

Most people who call us are a bit unsure how this all works, and do not want to feel sold to. Fair enough. So here is exactly what happens, in order, with nothing hidden.

  1. 01

    First chat

    You tell us what you want, and just as importantly, what you never want to go through again. No hard sell, no pressure, no obligation.

  2. 02

    Preliminary stage

    We finalise the design and your selections, and investigate the block with a contour survey and soil test. We get real fixed prices from our suppliers, not guesses.

  3. 03

    Full-size walkthrough

    Before we build, you walk your home at full size, with furniture in place, and change anything while it is cheap to change.

  4. 04

    Fixed price and build

    You sign a fixed price contract with no allowances hiding in it. Your build takes one of our limited slots for the year, so the same trades stay on it start to finish.

  5. 05

    Handover

    You move into the home you walked through, because we sorted the detail first. No surprises at the end, because there were none left by the start.

The detail

Our design builder process, in detail

01

Stage 01

Design stage

  1. Includes concept plan and initial estimate

    01

    Concept proposal

    • You meet with our preferred designer to discuss your new home design, and the designer drafts the concept plan.
    • Toby supports you throughout with feedback and suggestions from a professional and practical builder's perspective. You can make unlimited changes until the design is right.
    • An initial estimate follows, based on Highwater Homes' Signature Inclusions and your own wish list items.
    • You get access to your own online client portal: specifications, construction schedule, budget and a direct line to our team.
  2. Includes fixed price tender proposal

    02

    Preliminary Building Agreement

    • The PBA is specific to your home: construction-ready architectural drawings, Geotech report, contour survey, engineering and site inspection, amongst other items.
    • Once these reports are complete, we can give you an accurate, fixed price to build before you sign the contract.
    • You visit our suppliers and make your selections, supported at each showroom by our design and colour consultant, so what you want included is exactly that.

02

Stage 02

Pre-construction stage

  1. In our office

    03

    Sign contract

    • We meet in our office to sign the Fair Trading contract and other required documents.
    • The deposit is paid after the cooling off period.
  2. Construction approval

    04

    Certifier approval

    • After a final review of your plans and documents, we prepare and submit everything to the Principal Certifying Authority and all relevant regulatory authorities.
    • This approval is required before any building works start.
  3. Online

    05

    Final selections

    • You complete and confirm your selections in the online project management system, and watch your building schedule come to life.

03

Stage 03

Construction stage

  1. Watch it built 24/7

    06

    Construction

    • Regular updates and site meetings with Toby and the site manager.
    • Full access to the online project management system for every job detail during construction.
    • Opportunities for critical stage inspections through your home on a regular basis.
  2. The most exciting day

    07

    Handover

    • Before handover you get a comprehensive walkthrough of your home.
    • The online schedule tells you the date well in advance, so you can plan to have the day off.
    • You meet Toby personally to receive the keys to your beautiful new home.
  3. After the keys

    08

    Ongoing support

    • A maintenance period to address any items that need attention, with access to trades and suppliers.
    • Regular emails keep you informed about what is required at certain stages after handover.
    • Peace of mind with a six year structural warranty on your new home.

Lifesize plans

Walk through your home before it is built

Think of it as a test-drive for your custom home.

  1. 01

    Projected at full scale

    Your lifesize plans are projected at full scale onto the floor of a large collaborative space.

  2. 02

    Walk every room

    Feel the proportions of each room, how the spaces connect and how circulation works, with moveable furniture in place.

  3. 03

    Change it while it is free

    Refine the layout before construction begins, and avoid the regrets many new builders find after it starts.

Book a walkthrough

Process questions

Before you start

  1. A free quote is quick because it is a guess, and it hides the unknowns until after you sign, when you can least afford to say no. A paid preliminary stage covers the design, selections, site reports, engineering and real supplier prices needed to give a genuine fixed price. The fee is what lets the builder stand behind the number. At Highwater Homes, the preliminary for a design and build can cost up to $40,000, which includes council approval fees, and a tender on existing approved plans is $5,000.